Details: balance work of design, construction and retrofitting of new/ leftout works of piped water supply scheme under jal jeevan mission at village sayyadpur khegaon , siloda block chhegaon makhan distt. khandwa based on tubewells including installation of electric submersible/ centrifugal water motor pumps, construction of 02 nos. of incomplete overhead tanks, 02 nos. of incomplete sumpwells, 02 nos. of incomplete pump house, laying and jointing of rising main, distribution pipe line system, household tap connections, electric power connections at tube wells including cost of all material and labour with testing commissioning of new/ already laid pipeline thereafter 90 days trial run of entire scheme
Sector: Water supply and Sewerage