Description: Maintenance and Repair Work NH 527B old NH 105 from chainage km 14 950 to km 53 76 Name of Work Maintenance and Repair Work of NH 527B old NH 105 from chainage km 14 950 to km 53 76
Details: ROUTINE MAINTENANCE (Lump Sum)[for Total 60 months] INITIAL RECTIFICATION WORKS (LumpSum) [To be completed within 06 monthsfrom the notice to proceed] PERIODICAL MAINTENANCE WORKS(Lump Sum) [To be completed as decided by the Engineer but overlay of Highway to be completed within 24/48 months (as the case may be) from the date of notice to proceed]. EMERGENCY WORKS (Unit Rates) Total Estimate Cost Add-GST @ 18% Add-Labour Cess @1% Add-Seigniorage Fee
Sector: Road development