Description: TO (I) DESIGN AND BUILD TWO NOS SEWAGE TREATMENT PLANT OF INSTALLED CAPACITY 2.5 MLDON RIVER HARBORA AND 4.5 MLD ON BELWA-SATHI CANAL ALONGWITH ALL APPURTENANTSTRUCTURES AND ALLIED WORKS CONTROLLED WITH SCADA (II) SURVEY, REVIEW THE DESIGNS,REDESIGN WHERE NECESSARY, AND BUILD 4 NOS SPSALONG WITH 6.12 KM INTERCEPTION DRAININCLUDING SCREENS AND MECHANICALLY OPERATED GATES FACILITATING SURFACE WATERRUNOFF INTO RIVER/CANAL (III) OPERATION & MAINTENANCE OF THE COMPLETE WORKS OFSEWAGE TREATMENT PLANT,SPS, INTERCEPTION & DIVERSION WORKS, AND EFFLUENT CHANNELFOR A PERIOD OF 15 YEARS IN NARKATIYAGANJ TOWN , STATE OF BIHAR , INDIA.
Sector: Urban Authority