Details: ghoshi sukiyama road to narma math setting out pillars , providing & fixing of working benchmark pillars 1 nos. per km & 4 nos. of reference pillars required for 1 km. as per drawings given and direction of e/i clearing and grubbing road land including uprooting wild vegetation , grass,bushes,shurbs,saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and unseviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per technical specification(clause201.1) construction of embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per technical specification clause 301.5 . (including royality & labour cess). for 1000m 100%. construction of subgrade and ear
Sector: Road development