Details: school name:-ms baurhar, block-harlakhi 1 2. clearing of site work item description rate quantity/no. amount number 308.00 1.00 306.00 2 20.34.1 construction of bore for pile of 25 cm diameter 170.30 14.58 2600.00 20.34.2 construction of under ream at desired depth for post of 63 cm diameter 190.30 6.00 1141.00 5.1.2 filling work in proportion to rcc sand in pile 46.30 4142.00 2 2.8.1 soil excavation work in foundation 360.70 2.06 750.00 3 2.28 work of filling clean sand in foundation 281.40 0.36 102.00 11.72 100a p of flat soling 283.30 4.76 1347.00 5 4.1.8 plan cement (p) in foundation 148 mm cement sand chips in stone proportion 2975.20 0.36 1078.00 nets check- work and nota sand with 5.1.2 weight cc in bean (11.53) cement sand chips in stone proportion 4686.30 0.66 3086.00 7 6.1.12/1 proportion of 100a brick machining cement mass (1) in kurti 5017.90 0.56 2001.00 6.18.4a+ 6.19a 100a 125 mm brick machining cement mass (1) proportion of 1 689.00 20.94 14429.00 2 6 1549 supply and com
Sector: Education Misc