Details: demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead/out side cel campus as per direction of engineer-in-charge.-in cement mortar. dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead/as per the direction of engineer-in-charge. : of area 3 sq. metres and below demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead /outside cel by the contractor as per direction of engineer - in - charge. nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) dismantling tile work in floors, wall and roofs laid in cement mortar including including disposal of dismantled materials i/c malba all complete as per directions of engineer-in-charge. for thickness of tiles 10mm to 25mm earth work in excavation by mechanical means (
Sector: Electronics