Details: excavation in foundation in ordinary soil, loam, clay or sand including lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30 m from the foundation trenches. (s.i. 251) dismantling of concrete/brick work complete in all respects s.i. 694 m-150 brick work in super structure for 9" thick wall 1:4 (i cement and 4 coarse sand)all complete s.i. 305 & 309+310 first class brick work for foundation (item no.305) sor 2022 (s.i. 305) p/l of factory made 80mm thick interlocking cement concrete tiles (sor 2022 new item) page-41 concrete with 4 cm guage stone ballast, coarse sand of 2.50 fineness modulous and cement in proportion of 8:4:1 in foundation and under floor, including supply of all material labour and t&p etc. required for proper completion of the
Sector: Urban Authority