Details: electrical work a- general checking and preventive maintenance of 33 and 11 kv switchgear.b- in case if any fault occurs shall be attended by highly technically qualified and experienced staff within three hour after information to the contractor.c- if required any spare of 33 and 11 kv switchgear provided by the contractor as spout bus, spout line, bushing epoxy of ceramic, bushing rod copper, tulip contact. current transfer 600/300/5, 400/200/5, charging gear with bearing of operating mechanism, charging drum spout connection, arching chamber, busbar connector relay, oti/ wti. etc.d- required joot oil greece availablity by the contrctor for the overhauling of busbar. note:- 1. all work related by annual maintenance of 33 and 11 kv vcb done by contractor and all required spare parts and material provided by contractor at his own cost.2. comprehensive annual maintenance and testing of injection set of 33 and 11 switchgear and training of sub-station operator. earthing of pole for dou
Sector: Distribution