Details: part (a)- civil work dismantling of brick work or stone work in lime or cement mortar and including stacking of material as directed by e/i within a distance of 60 meters (200 feet) disposal of dismentalled material from site 5km distance.(cartage of ballast, kankar, coal, grit or sand etc, including loading & unloading) earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as werll as 10 sqm on plan including getting out and disposal of excavated eath upto 50 m and lift upto 1.5m, as directed by e/i 2.1.1. all kinds of soil. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- all work up to plinth level. 1:4:8 (1 cement : 4 coarse sand (zone-iii): 8 graded stone aggregate 40 mm (nominal size) class -150 brick work 1:4 (1 cement : 4 coarse sand ) in super structure including supply of all material, labour, t&p etc. required for proper completion of work . (pwd s.i no.309) 12 mm thi
Sector: Urban Authority