Details: desilting of s.w. drain by excavation in mud soil & foul condition including malba, garbage, kankar & other extra material at the following lift & lead up to 30m (100 ft.) and including and disposal of surplus earth as directed by the engineer-in-charge. upto a distance of 30m (100 ft) from the nala sor 2022/251(a) (0.00 to 1.50 mt) same as above item no. 1 but 1.50 to 3.00 mt lift same as above item no. 1 but 3.00 to 4.50 mt lift disposal of malba, garbage seild found in deselting of nala up to 5 km including loading unloading etc all completed as per direction e/i .
Sector: Urban Authority