Details: excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer-in-charge upto a distance of 30m from the foundation trenches. s.i.no.251(a)/sor-2022 cement concrete with 4cm approved stone ballast, coarse sand and cement in proportion of 8:4:1 including supply of all materials, labuor,t&p etc. required for proper completion of the work si no. 281. sor-2022 m-150 class b/w in 1:6 one cement and six course sand mortar in foundation and plinth including supply of all materials, labour & tools and plants etc. required for proper completion of the work s.i. no. 303(a)./sor 2022 2.5 cm thick damp proof course with cement concrete consisting of 1 part cement 1 ½ parts approved coarse sand and 3 parts approved 10
Sector: Urban Authority