Details: earthwork: excavation in trenches for foundations,pipes cables etc. in ordinary soil (loam, clay or sand) including lift upto 1.5 m lead upto 50m and drassing of sides and ramming of bottom disposal of surplus excavated earth as directed by engineer- in- charge with lead of 50 m. (pwd si no-251)/2022 providing and laying in cement concrete in 8:4:1 ( stone ballast 8 (40 mm nominal size) : 4 approved coarse sand : 1 cement and curing complete, including cost of formwork in foundation. (pwd s.i no- 281) rcc work with cement approved coarse sand and 2cm (3/4")gauge approved stone ballast in the proportion 1:1½:3 (1 cement : 4½ aggregates)slab including necessary centering & shuttering excluding supply of reinforcement and its bending the same with 24 bwg gi binding wire and necessary centering & shuttering excluding supply of reinforcement and complete 284/2022 r.c.c. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in coloumns and walls excludi
Sector: Urban Authority