Details: providing and laying gsb, wmm, tc, dbm,pc & bc in approach road , viaduct portion, r e wall and service road with all materials, t & p etc. as required as per design and morth/ technical specifications of pwd details as gven below construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. providing and applying tack coat with bitumen emulsion using emulsion p
Sector: Infrastructure