Details: dismantling of old brick laid on edge kharaja including stacking of old bricks si no.3 20.16 (3) dismantling brick work and stone work in lime or cement mortar i/c all respect earth work in filling with royalti cartage upto 8 km only p.c.c 1:6:12 cement fine sand and brick ballast i/c all repect m-150 brick work in one cement and four corse send (1:4) and foundation i/c all repectsor no=6.04=305a 12 mm thick cement plaster with cement and core sand mortor 1:4 over brick work thickness not less i/c all respect p.c.c in 1:2:4 with 2 cm guage app stone grits including of all work complete (ssi no = 279@) supply and laying of grangular sub-base by provided well graded material for grading i.c sprading in unoforme layers with moter grader on prepare surface, mixing by mix in place method with rotawator at omc and compqtig with smoot while roller to achivev the desire the dencity complete as per technical specificstion close 401 supply and laying of 80mm thick i shaped rubber moulded vi
Sector: RDPR