Details: civil work-(a)dismantling existing plaster including disposal of refuse as directed by engineer-in-charge with in a distance of 60 meter (200 feet). s.i. no-706/sor-2022 m-150 brick work in superstructure 1:4 (one cement and four coarse sand) including necessary cutting and moulding of brick and rewuried thickness of walls not to be less than 1.0 brick. si 307a+309+310/2022 supply and fixing mann on other approved (is marked)z section single double leaf openeble shutter steel window with required shesh bass including supply andfixing of approved heavy quality m.s hinges hendis 30mm long stay and holes fasts etc . complee wrought to required form including drilling holes ,required welding where necessary and also including supply of steel fitting bilts nuts waslage and lasom etc and then fixing required for proper complation of wove as per direction of engineer in change including all material labour t&p machinary royailty and all taxes etc complete as per direction of engineer in chang
Sector: Urban Authority