Details: demolishing brick work manually/ by mechanical means includingstacking of serviceable material and disposal of unserviceable materialwithin 50 metres lead as per direction of engineer-in-charge(15.7.1) dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the engineer-in-charge within a distance of 60 metre (200 feet).(15.3) dismantling of existing plaster including disposal of refuse as directed by the engineer in charge(15.56) dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materials as directed by the engineer-in-charge within a distance of 60 metre (200 feet). (15.23.1) above plinth to floor-v lvl providing and laying in position specified grade of reinforced cementconcrete, excluding the cost of centering, shuttering, finishing andreinforcement 1:1.5:3 (1 cement : 1.5 coarse sand (zone-iii) derived from naturalsources : 3 graded stone aggregate 20 mm nom
Sector: Sugar