Details: a earth work in excavation in foul position soil lead 50mt.& lift 1.5 mt. incl. lab. t&p etc all complete . p/l of base concrete in 1:6:12 with cement, l-sand and 40mm s/b including mat. lab. t&p,etc all complete. m-150 class brick work in 1:4 cement approved coarse sand etc all complete work. p/l 12mm thick cement plaster in 1:4 etc all complete work. rcc work with cement concrete (1:1.5:3) including all completion of work. m.s or iron work in renforcement cutting bending , binding ,and placeing incl. etc. all. s/o ms pipe 300mm dia delivery and suction pipe etc s/w ms flanges 300 mm dia. mr s/o ms 300mm dia. mr s/o ms bend 300mm dia. mr s/f of rubber packing 300 mm dia. mr s/o nuts and bolts etc. labour charge for shifting and laying and jointing of 300 ms pipe and specials. p/l of 125 micron polythine including etc. all complete of work. s/laying of gsb 53.-9.5 mm thick s/b upto 10cm loose layer including etc. all complete of work. consolidation of gsb upto 10 cm
Sector: RDPR