Details: earth work in cutting or in embankment in ordinary soilexcavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layersincluding ramming and dressing the surface to required levels andslopes and also including 1.5 m lift and 30m lead. the earth inform of cutting to be used as spoil banks within 50m distance asdirected by the engineer-in-charge. item no. 253(a) cartope upto 5km providing and laying dry granulr sub base in two layer 10 cm each(gsb) to including mechanicallycompaction etc. complete. as pr morth spec.(a.r.) providing and laying sepreading wet mix macadam (wmm) two layer 10 cm each to thick including mechanically compaction etc. complete.(a.r.) . as pr morth spec. providing and applying primer coat with bitumen emulsion slow setting using spray set including cleaning of road surface and sparying primar at the rate of 0.5 kg per sqm with mechanical means.(a.r.) as pr morth spec. providing and laying bituminous
Sector: Urban Authority