Details: r.c.c. drain on side of service road asper drawing attached earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with sand filling below lean concrete 10 cm thickness plain cement concrete m-15 nominal mix 10 cm thickness in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days plain reinforced cement concrete in open foundation complete as per drawing and technical specifications m- 30 including cover 10 cm thickness supplying, fitting and placing hysd bar reinforcement in foundation complete as per drawing and technical specification (steel @ 50 kg/
Sector: Infrastructure