Details: excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m lead upto 30 m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer-in-charge upto a distance of 30 m from the foundation trenches. (s.i. no. 251a) concrete with 4 cm gauge stone ballast, coarse sand and cement in proportion of 8:4:1 in foundation and under floors including supply of all materials, labour, t&p etc. required for proper completion of the work. (si no.281) rcc work with cement, approved coarse sand and 20mm stone grit in proportion of 1:1.5:3 in raft foundation and footings excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 b.w.g.g.i. binding wire and including necessary centering and shuttering etc. and supply of all materi
Sector: Urban Authority