Details: (a) construction of roads earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5m lift and 30m lead . the earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30m distance as directed by engineer–in-charge. cartage of surplus earth upto from 1km distance royality. and for mechanically compacted to achieve 95% proctors density including arrangement water and all t&p including roller and its fuel etc. si no.253(a)+260(a)+261(b) = 78.00+20.00+ 48.00 =146.00 construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and comp
Sector: Urban Authority