Details: details of work. of auxiliary structure consisting of columns, beams, peaks, masts etc. and auxiliary structure required for installation of isolators, c.ts. p.ts. l.as. and all other equipments. all material to be erected shall be supplied by upptcl free of cost but all men, material and t&p required for satisfactorily completion of work shall be arranged by the contractor at his own cost. 33 kv side (auxilary structure) of following equipments as per instruction manual of various equipments and technical specification including shifting of material/equipments from store to site including all other associated work to complete the job satisfactorily. 36 kv c.b. 36 kv pt 36 kv c.t. 36 kv line isolator 36 kv bus isolator ct/pt junction box 36 kv sas based tripple feeder panel cutting,strengthening,bending,laying 800 mm.below in side ground and above ground of following size of ms flat for earthing of main and auxiliary structure, equipment structure and its material etc. enclud
Sector: Transmission