Details: a) providing, fixing & testing of pvc pipe 4” (per two-meter clamp) with 10 kg pressure, make supreme, (door tee, door bend, socket, solvent, clamp all fittings, core cutting, chase cutting and hole filling with water proof and complete work.) b) dismantling of existing pipeline 4”c) line connects to main chamberd) with pcc covering two-meter clamp) (sd-11), make supreme, (elbow, tee, socket, brass elbow, brass tee thread/unthread, clamp with all fittings, core cutting and hole filling with water proof and complete work).b) dismantling of existing pipeline 2” a) providing, fixing & testing of ball valve 25mm, make zoloto (elbow, tee, socket, brass elbow, brass tee thread/unthread, clamp with all fittings core cutting and hole filling with water proof and complete work. b) dismantling of existing old ball valve and fittings a) providing and fixing of 6" pvc pipeline make supreme with the help of required fitting, core cutting and hole filling with water proof and all complete work.b) i
Sector: Management Education