Details: shifting, dragging and stacking of damaged t/fs to be repaired in the workshop at proper place in cutting yard & pre-checking/ physical inspection, testing of transformer before dismantling i.e. megger test (if ok) then hv test (if ok) then no-load & load losses tests as per instructions of junior engineer in charge. (i) 10/16 kva (ii) 25 kva (iii) 63 kva (iv) 100 kva (v) 160 kva (vi) 250 kva (vii) 400 kva (viii) 630/1000 kva cutting of sealed t/fs top cover/ opening of nut and bolt of damaged t/f cover plate, de- tanking of core coil assembly dismantling of hv&lv coils and other accessories, draining of t/f oil in sump well and weighing of scraps and shifting of all scrap to the store of je in charge.(i) 10/16 kva (ii) 25 kva (iii) 63 kva (iv) 100 kva (v) 160 kva (vi) 250 kva (vii) 400 kva (viii) 630/1000 kva dismantling of core stamping and its cleaning of dust and dirt.(i) 10/16 kva (ii) 25 kva (iii) 63 kva (iv) 100 kva (v) 160 kva (vi) 250 kva (vii) 400 kva (viii) 630/1000 kva a
Sector: Distribution