Description: 02/EDC(H)/2024-25
Details: Name of Work: Installation of electrical systems for connection in the primary/upper primary schools for booths in view of Lok Sabha elections Under Of Electricity Distribution-Division-II, HardoiItem Description2Safe carriage, loading-unloading with proper stacking of following material from store centre to pit site/JE dump store. PCC Pole of size 8.5 mtr longST pole 11 mtr. Long.Stay Set Complete11, 33 KV Pin with NetDisc insulator With fitting (B&S) 70KNMS Earthing Rod (2540x20 mm) With FittingACSR Weasel ConductuctorTOP, DROPER, T-OFF clamp etc.Dog/Rabbit conductorABC (1X16+1X25)SqmmABC (3X50+1X35+1X16)SqmmWorkPCC single Pole and Errection of PCC Pole 8.5 mtr long with Grouting & with all accessories Replacement of Broken PCC double Pole and Errection of PCC Pole 8.5 mtr long with Grouting & with all accessoriesPlacement of 11/0.4 KV T/Fs with the help of crane sleepers and man power etc. from dump place to newly constructed T/Fs DP & erection & commissioning of 2
Sector: Distribution