Description: Agra Water Supply Re Organization Scheme Trans Yamuna Zone I and II NAME OF WORK Surveying Soil investigation Engineering Design Supply of all materials labour T P etc required for completion of following works of Agra Water Supply Re Organization Scheme Trans Yamuna Zone I II on turn key basis Intake Well 80 MLD Cum Pump House Approach Bridge and associated works Raw water rising Main 1100mm dia from intake to WTP Water Treatment Plant With Advanced Treatment Process 55 MLD RCC OHTs ZPSs CWR cum Pumping Station Rising main Feeder main Distribution System SCADA Room Chlorination room Meter Room Panel Room Boundary Wall Site development works etc and other appurtenant works including SCADA and Automation as per specifications in tender document The scope of work includes Commissioning Testing trial run of 3 months defect liability period of 12 months for Civil works 24 months for E M works after completion of successful trial run All completed and commissioned work under Agra Water Supply Re Organization Scheme Trans Yamuna Zone I II shall be hand over to Jal Kal Vibhag Nagar Nigam Agra after 3 months successful trial run period
Details: Designing, constructing and commissioning of closed type raw water intake well (Jack well) of 20.0m inner clear diameter on open foundation including pump house structure of 20.0m inner clear diameter including all necessary arrangement for excavating, coffer dam, concreting of sub structure and super structure etc with all materials and labours in river Yamuna including all necessary surveys as per latest Indian standard for successfully constructing and commissioning of the intake well.Intake well sub structure of the 20.0 m inner shall be closed type in RCC grade M:30 including providing, supplying and fabricating reinforcement as per design and drawing. Construction of necessary coffer dam and its removal is part and parcel of the job. Also include the dismantling and proper disposal of the enabling works after the completion of the construction. Also provide temporary approach to the intake well site and proper working space with full safety of the labour at intake well site.Pump
Sector: Water supply and Sewerage