Description: Replacement Renovation of some electrical panels and other works at HRI Prayagraj Name of Work Replacement renovation of some electrical panels other works at HRI Prayagraj
Details: Disconnection & removing of old (faulty) Voltmeter and Ammeter from substation panel and SITC of new CT based Digital Voltmeter and Digital Ammeter of same rating at same places in existing main switch board panel in substation SITC of following main distribution board in MS encloser including Interconnection, earth connection, painting etc. MDB comprising of one no. 125 Amp, 4 pole SFU for incomming power supply, one no. 100 Amp.4 pole SFU for outgoing power supply, 2 no., 63 Amp, 4 pole MCB, 2 no., 40 Amp, 2 pole MCB, 2 no. 40 Amp 3 phase energy meter, 2 no. 40 Amp 1 phase energy meter, one set of 3 phase & neutral busbar, one no. earth busbar with all phase indicator lamp, Voltmeter, selector switch etc. MDB comprising of one no. 100 Amp, 4 pole SFU for incomming power supply, 6 no., 40 Amp, 2 pole MCB, 6 no. 40 Amp 1 phase energy meter, one spare compartment for future enhancement, one set of 3 phase & neutral busbar, one no. earth busbar with all phase indicator lamp, Voltmeter, s
Sector: Research center