Details: schedule g-1 (construction of rcc raw water pumping station) survey, soil investigation, design, drawing, supply of all materials, t&p, labour etc required for construction, completion, testing and commissioning of raw water pumping station for 40 mld average discharge(peak factor to be taken as per clause 2.1.1 of section 2,chapter-1) water retaining structure in rcc m 35 grade design mix and 3 or more coats of epoxy painting on whole rcc work as per relevent i.s.code . finished ground level is to be 0.60 m above natural ground level and all other allied building works such as meter room, ht pannel room, lt pannel room, transformer and dg platform with covering, water recharge unit, campus drainage system, approach road and campus road work (rcc road), horticulture & landscaping work including necessary earth filling,drinking water arrangements, pump operator room with toilet & kitchen , laboratory including all necessary apparatus and chemicals etc as mentioned in scope of work
Sector: Water supply and Sewerage