Description: Construction of Boundary wall Laying of Interlocking tiles and Installation of Submersible Pump in Benia Hospital Parisar Name of Work Construction of Boundary wall Laying of Interlocking tiles and Installation of Submersible Pump in Benia Hospital Parisar
Details: Excavation in foundations in Ordinary Soil (Loam Clay or sand) including lift upto 1.5m. (5 fts.) and lead upto 30 m. (100 fts.) & including filling, watering and ramming of excavated Earth into the trenches or into the Space between the building and sides of foundation trenches or into plinth and removal and disposal of surplus earth as directed by the engineer-incharges upto a distance of 30m. (100 fts.) from the foundation trenches.including all T&P Phowarah and basket etc. complete (SOR2020 -It.N.-251) Providing and laying Cement concrete with 4cm gauge approved stone ballast, approved coarse sand and cement in the proportion of 1:4:8 (1 cement ; 4 Coarse sand : 8 graded Stone Ballast 40mm. Nominal size.) including supply of all materials, labour and T & P etc. required for proper completion of the work. [SOR-2020- 281] R.C.C work with cement approved coarse sand and 2 cm Gauge approved stone ballast in the proportion of 1:1.5:3 in foundation & footing excluding its fixing and
Sector: Urban Authority