Description: Bus Stop me Saunchalay Ka Nirman Hatwara 6 Name of Work Bus Stop me Saunchalay Ka Nirman Hatwara 6
Details: Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60metres.(S.I. No-692) Excavation in foundation in ordinary soli(loam clay or sand) including lift up to 1.5 meter(5ft) and lead upto 30m (100ft) and including filling, watering &ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of suplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. Supplying laying of Sand in foundation or plinth including all materials, labour and toos and plants etc.required for proper completion of the work. Cement concrete with 4cm(1/2) gauge approved stone ballast, approved coarse sand. Cement in the proportion 8:4:1 including supply of all materials, labour and toos and plants etc.required for proper completion of the work. Random cou
Sector: RDPR