Details: civil work supplying and stacking at site good earth complete finished item of work as directed by engineer-in-charge. providing and fixing neelgiri/mexican grass turf with earthy 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden (dhurmos) and than rolling the surface with light roller make the surface smoothen and light, watering with sprinkler and maintenance for 30 days or more till the grass establish properly as per direction of officer incharge. providing & laying selection no. 1 doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same and maintenance for 30 days or more till the grass establish properly, as per direction of the officer in charge providing and stacking of thuja compacta of height 75-90 cm., conical shaped, well formedwith healthy
Sector: Smart City