Details: providing,laying ,spreading and compacting graded aggregate to granular sub base with close graded specification including primixing the material with water at omc in mechanical mix plant carriage of mix material by tipper to site laying in uniform on well prepared surface and compecting in vibratory rollar to achive the desired density.complete as per close 401(495tonne) providing and applying primer coat with bitumen emulsion slow setting using spray set including cleaning of road surface and spraying primer at the rate of 0.50 kg per sqm with mechanincal means providing and laying bituminous macadam with 100-200 tph hot mix plant producing an average output at 25cum /hour using a crushed aggregate of specified grading premixed with bituminous binder @ 3.4% transported to the site land over a previously prepared surface with paver finisher to the required grade level and alignment and rolled as per clauses 501,6 and 501,7 to achieve the desired completion. providing and laying tack
Sector: Urban Authority