Details: repairing of old oil pit floor , insallation of 3 mt motrized chain pully block and extension of height of old shed (02) dismantling of old & damage gi sheets of existing structure with labour & shifting up to 50 mtr. (csi no. 15.07) excavation in foundation in soil mixed with moorum/shingle/kankar requiring the use of special t&p such as pickaxes, sabbals etc including lift 30 m and including filling ,watering & ramming of excavation earth into the trenchs or into the space between the building & slides of foundationcomplete size of 1.5mx1.2mx1.5m for (8 nos.) column for 4''x 4" hollow m.s. pipe including all t&p, labour charges etc. concreting & grouting of 8 nos. 4"x4" hollow ms pipe with ratio of 1:6:12 and size of .45mx.45mx1m including all materials, t&p , labour charges supply and fabrication of 8 nos. column of 4"x4" hollow m.s. pipe in height of 6.0 mtr with proper welding , grinding & fixing etc. top plate:- top plate "double" size 300 x 300 x 12 mm thick supply and in
Sector: Distribution