Details: construction of civil works for making of 8.50 m long (180 kg working load) pre-stressed concrete poles in ratio of 1:1.66:2.95 with cement, approved quality stone dust (max silt content not more than 4%) and 12mm downgraded approved stone ballast by dry volume in steel moulds as per technical specifications and consisting of following operations including cost of all labour, approved quality stone ballast & stone dust, anchor grip/barrels & other consumables diesel oil for dg set etc . but excluding cost of cement, h.t. wire & g.i. wire, which will be supplied by the department free of cost at the store of pole unit yamuna bank power house colony agra. the special t&p shall also be provided by the department free of cost such as concrete mixer, , moulds, concrete & pole carrying trolleys, tension towers, electric hoist (2.0 ton capacity) mobile tensioning tower for tensioning h.t. wire, chain pulley block, pole testing / cube testing m/c, electric welding m/c, dewatering/submersible
Sector: Distribution