Details: items to be executed removal of huge trees from the wall of north side including with the help of scaffolding, jhulla work, iron patty, dabete without any damage of the structure including disposal of with in a lead upto 200 m approx. earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m provision for hiring charges of water tanker (5000 ltr) capacity which are required during the execution of work providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scafolding in stepped manner as per requirement of site, made with 40 mm dia m.s. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with m.s. tubes, m.s. challis, m.s. clamps
Sector: Museums