Details: survey, design, drawing, submission of dpr with construction & operation of 02 nos sump well (01 no. x 2 x 10 cusec flood pump sets & 01 no. for 3 x 20 cusec flood pumps) including soil, structure testing etc as per eic. items include all type of expenses like departmental approval (railways / irrigation), survey of site, design & drawing as per norms, contruction of sump well with desired modification in nala including water diversion, land filling of loose sand sinking area etc. complete with required mechanical fittings such as sluice gates, pump suction line & fittings, overflow arrangements etc. no. other claim or charge is payable to the contractor.
Sector: Water supply and Sewerage