Details: dismentaling of flexible pavement and disposal of dismantled material upto a lead 1000 metres stacking seviceable and disposal of unseviceable material separately within a lead 50 mtr as per direction of engineer-in-charge. si no 20 new sor 2022 cement concrete with 4cm gauge stone ballast, fine sand of 1.25 f.m & cement in propotion of 8:4:1 in foundation & under floors including supply of all materials , labour, tools & plants etc. required for proper completion of the work si no 275(a) uppwd sor-2022 providing & laying in position of specified grade of reinforced cement concrete with 1:1.5:3 cement , coarse sand and stone gritt 20mm nominal size including the cost of centering shuttering finishing and excluding reinforcement .si no 5.2.2 page 28 mild steel or iron work in plain work such as reinforced concrete brought to required shape as neccesarry including bending for proper completion of the work and including the supply of steel and its waistage bend hook and authorized over la
Sector: Urban Authority