Description: 38 EDC H 2023 24 Name of Work Strengthening work of Poles and lines increasing capacity of overloaded transformers under Additional Business Plan 2023 24
Details: Safe carriage, loading-unloading with proper stacking of following material from store centre Hardoi to pit site/JE dump store. P.C.C. /ST Pole 8.5/11 mtr long 11 KV Pin Insulator with Pin 11 KV Disc Insulator with fitting ACSR Weasel Conductor Earthing Rod Stay Set G.I. Wire 6 SWG ABC Cable (3×50+1×70+1×16) mm2 LT XLPE Cable Aluminum 3.5×240mm2 LT XLPE Cable Aluminum 3.5×400mm2 LT XLPE Cable Aluminum 1×240mm2 25 KVA T/F 63 KVA T/F 100 KVA T/F 250 KVA T/F 400 KVA T/F Line Material Distribution Box 3-phase Work of PCC/STP 8.5/11 mtr long single pole with Grouting & with all accessories (Only Pole and Insulator Supplied by department) of PCC/STP 8.5/11 mtr long double pole with Grouting & with all accessories (Only Pole and Insulator Supplied by department) Grouting and Nozzling of 11 KV stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (sand, brick blast & cement). All material except stay wire shall be supplied
Sector: Distribution