Description: 40 EDC H 2023 24 Name of Work Strengthening work of Poles and lines increasing capacity of overloaded transformers under Business Plan 2023 24
Details: Safe carriage, loading-unloading with proper stacking of following material from store centre Hardoi to pit site/JE dump store. Top Channel with clamp (125×65×2240)mm Dropper Channel with clamp (100×50×2028)mm Sub Station base angle (75×75×6×2028)mm LT Clamp with nut bolt LT Shackle Insulator Nut Bolt for shackle Insulator 25 KVA T/F 63 KVA T/F 100 KVA T/F 250 KVA T/F 400 KVA T/F PCC Pole 8.5 Mtr. Long LT XLPE Cable Aluminum 1×240mm2 LT XLPE Cable Aluminum 1×400mm2 LT XLPE Cable Aluminum 3.5×240mm2 LT XLPE Cable Aluminum 3.5×400mm2 ABC Cable (3×50+1×70+1×16)mm2 ABC Cable (3×95+1×70+1×16)mm2 G.I. Wire 6 SWG 11 KV Fuse Set Stay Set Complete Earthing Complete ACSR Weasel Conductor Disc. Insulator with fitting 11 KV Pin Insulator with G.I. Pin Work of PCC Pole 8.5 meter long single pole with grouting & with all accessories. of PCC Pole 8.5 meter long double pole with grouting & with all accessories. ABC Cable (3x50+1x70+1x16)sq mm stringing sagging binding and jumpering of ABC with
Sector: Distribution