Description: Job Work Of Re Construction Of Godown No 01 Name of Work Job Work of RE CONSTRUCTION OF GODOWN NO 1
Details: Construction And Repair Work of Various Toilet Excavation in foundation soil(Loam clay or sand) including left upto 1.5 metre (5fts) and lead upto 30 Mtr.(100 fts.) & including filling watering and ramming of excavated earth into the tremches or into the space between the building and the sides of foundation trenches or into plinth and removal and disposal of surplus earth as directed Engineer in charge upto distance of 30m(100 fts.) from the foundation trenches. Add extra to items 1 for every additional 30m. Lead or part of 30m. Or for every additional 1.5m lift Dismantling jack arhed or wooden beam and barja roofs including RCC beam and concrete, roofs concrete and including stackings of materials as directed by Engineer in Charge with in a distance of up to 1.00 k.m. Dismantling brick work or stone workin lime or cement mortar and including stackings of materials as directed by Engineer in Charge with in a distance of up to 1.00 k.m. Distmantling of G.C.I Sheets sheets from the roof
Sector: Sugar