Description: Re Engineering of Bend in Approach Channel Up stream of Farakka Navigation Lock on National Waterway 1 Name of Work Re Engineering of Bend in Approach Channel Up stream of Farakka Navigation Lock on National Waterway 1 River Ganga
Details: Execution of dredging through the assistance of dredgers of appropriate size, type and capacity as per general conditions and Technical specification or any other suitable methods. The rates include Survey (at all stages Pre and Post dredging) and design fee, mobilization and de-mobilization charges, shifting charges from Shoal to Shoal, dumping / disposing off dredged material up to maximum of 500M through pipelines or road transportation with all leads & lifts on river Bank / or at designated site by EIC or his representative in 18 month of the Contract Period. Including all taxes (except GST) as prevailing and other charges, expenditure etc. in all respects. for Re-Engineering of Bend in Approach Channel Up- stream of Farakka Navigation Lock on National Waterway-1 (River Ganga) Quantity Based One-time Dredging for 18 months duration GST Amount of GST considered
Sector: Harbor