Description: WORK NO 8 Work of guardroom boundary wall and SS railing near newly constructed gate in authority office Name of Work Construction of Guard Room Boundary Wall and Fixing of SS Grill at BDA Office
Details: Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materials as directed by the Engineer-in charge within a distance of 60 metre (200 feet). UPPWD SOR 697 Supply and fixing of Kota stone in flooring 20 mm thick and joint filled with 1:2 cement and coarse sand with approved colouring materials to be given an even shade with 20 mm base coat (bedding) of 1:4 cement & coarse sand morter and polished by hand or machine and finally finished with french manson polish or other approved polish including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. UPPWD SOR 14.18 New Item Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary ac
Sector: Urban Authority