Description: Chief Engineer office campus Name of Work AR of Chief Engineer office campus
Details: Dismantling existing plaster including disposal of refuse as directed by Engineer-In-Charge within a distance of 60 meters. SI No. 706 12 mm cement plaster on rough side of single or half brick wall of mix: 1:6 (1 cement: 6 coarse sand) including cost of all material, labour, T&P etc. required for proper completion of work. Ch.-13/13.4.2 15 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand) including cost of all material, labour, T&P etc. required for proper completion of work. Ch.-13/13.5.1 Supply and fixing of flush doors, commercial quality conforming of I.S. 2202 part-1 (1983) including ISI marked oxidized iron fitting with screws, Bolt Hinges,Handles,Siliding bolt, Door Stopper and tower bolt etc. (B) 32mm thick SI No. Ch 9/ 470(b) Supply and fixing galvanized mosquitos proof heavy quality iron wire gauge or expended metal heavy quality over windows and including supply of C.P. Teakwood batten 8cmX1cm (3"X3/8")/flat iron 25mmX4mm an
Sector: PWD