Description: Re Construction of Primary School Patel Kanya Name of Work Re Construction of Primary School Patel Kanya
Details: Excavation in foundation in ordinary Soil ( Loam clay or sand ) including lift upto 1.5m lead upto 30.0 m & including filling watering and ramming of excavated earth into the space between the building & sides of foundation trenches or into the plinth and removal & disposal surplus earth as directed by the engineer I/C within a lead of 30 m.from foundation trenches. As per SOR 251 Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 1:4:8 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. As per SOR 281 Providing and injecting chemical for preconstruction antitermite treatment and creating and chemical barrier under and around the column pits wall trenches basement excavation top surface in plinth filling junction of wall and floor, along the external per meter of binding expansion joints surrounding or pipes and conduit etc. complete (plinth area of the building at ground floor o
Sector: PWD