Description: 02 EDC G 2023 24 Name of Work Removal of oil leakage from power transformer in the geographical location of EDSD I Awas Vikas under Electricity Distribution Division I Gonda
Details: 33/11 KV Substaion Awas Vikas 10 MVA T/F No. 1Stopping of oil leakage by application steel putti composite of two components steel filled epoxy resing and hardener before applying this material for stopping oil leakage remove the degreasing and sludge removal from the transformer and also remove the paint over surface where oil leakage is to be stopped letter tighening of competer nuts & bolts of the body and cleaning the completer transformer. 02 No. Radiator Flenge (L.T. Side) OLTC Top Cover OLTC Side Cover Inspection Cover Stopping oil leakage from Top Cover including nut & bolt 33/11 KV Substaion Awas Vikas 10 MVA T/F No. 2Stopping of oil leakage by application steel putti composite of two components steel filled epoxy resing and hardener before applying this material for stopping oil leakage remove the degreasing and sludge removal from the transformer and also remove the paint over surface where oil leakage is to be stopped letter tighening of competer nuts & bolts of the bod
Sector: Distribution