Description: I D of 7 drains and augmentation of rajapur STP capacity by 90 MLD Name of Work Survey Investigation Design Build Operate and Transfer 90 MLD Capacity Sewage Treatment Plant STP and 20 KLD Sludge Co Treatment Facility at existing Rajapur STP campus along with associate infrastructure including Interception Diversion and Construction of Drain Tapping of 07 Nos Drains Interceptor Trunk Sewerline 4200 Mtr Open cut trenchless method Construction of 02 Nos Sewage Pumping Station SPS 1 No at Rajapur STP Campus 74 MLD 56 MLD Capacity Ultimate Year Mid Year 1 No at Mumfordganj SPS Campus 59 MLD 39 MLD Capacity Ultimate Year Mid Year and 01 No Effluent Pumping Station 120 MLD 90 MLD Ultimate Year Mid Year with allied works including Rising Mains 3450 Mtr Open cut trenchless method Effluent Gravity Pipe Line 300 Mtr Open cut trenchless method and Effluent Rising main 250 Mtr with Operation and Maintenance period of 15 Years at Prayagraj Uttar Pradesh India on Design Built Operate and Transfer DBOT Mode Under the Namami Gange Programme
Details: Construction of 90 MLD STP at Rajapur and its appurtenant work Survey, Investigation, Design, drawing and construction of 90 MLD STP along with 20 KLD Sludge co-treatment Facility and appurtenant structures and allied work at existing Rajapur STP campus, Prayagraj city with appropriate and cost effective technology on sustainable & proven technology to deliver that treated effluent shall comply with the NGT directed discharge standards (April 2019). The work includes all civil structure and supply & of electro- mechanical equipments, instrumentation control works i.e transformer, DG set of suitable capacity with necessary accessaries, HT/LT panel with cable joiting material, earthing, suitable capacity non-clog submersible pumps (MOC- casing -2% NiCr, Impeller-ASTM CF8M, Shaft & Shaft sleeve- ASTM SS 410) capable of pumping 100mm particle with necessary accessaries such as motor, gate, valve, manual / mechanical screen,grit mechanism, blower , Electro-magnetic flowmeter totaliz
Sector: Water supply and Sewerage