Details: desilting of silt from existing drain clearance etc and including all work complete.( si no. 251a+ 25% for wet) disposal of excavation / mud or surplus material and cartage upto 2km.sheduled item no. 231a (146.20-45 ( average distance from all sides of city)
Sector: RDPR