Details: multipurpose hallexcavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the engineer incharge up to a distance of 30 meters from the foundation trenches. extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.all kinds of soil providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) including supply of all materials, labour t & p rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and includi
Sector: Infrastructure