Details: earth work in foundation in dry ordinary (loam, clay or sand) including lift upto 1.5 m and lead upto 30 m and including back filling , watering and ramming of excavated earth into the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30 m from the foundation trenches for pump house and weir work providing and laying in position cement concrete of grade m10 for pump house and weir work excluding the cost of centering and shuttering - all work up to plinth level 1:3:6 (1 cement : 3 coarse sand (zone-iii) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) including cost of mixing with batching plant, carriage of concrete from batching plant to site of work, placing and cost of all material, labour, t&p etc. required for proper completion of the work as per direction of engineer-in-charge. providing and layi
Sector: Irrigation