Details: excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. dsr code no. 2.25(b) page no. 94 brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in foundation and plinth in: cement mortar 1:4 (1 cement: 4 coarse sand) dsr code no. 6.1.1 page no. 127 cement plaster in fine sand :12mm cement plaster of mix : 1:4 (1 cement : 4 fine sand) dsr code no. 13.1.1 page no. 217 1:5:10 (1 cement: 5 coarse sand (zone-iii) derived from natural sources: 10 graded stone aggregate 40 mm nominal size derived from natural sources) dsr code no. 4.1.10 page no. 103 providing and laying design mix cement concrete of m-30 grade, in roads/taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nomin
Sector: RDPR